Case Studies

Choose a Case Study below to discover how we’ve helped businesses like yours.

Bunsen burner gas pressure at UWE University of the West of England
UWE - Gas Pipework Installation

Discover how UES installed new gas pipework and purged the gas mains to increase the lab capacity in UWE’s science labs.

Two condensing Lochinvar water storage units fitted by Bristol based engineering company UES at a Network Rail fuelling depot.
Network Rail - Canton Fuelling Depot

Faced with two gas-fired water heaters that had fallen beyond economic repair, Network Rail needed UES to come to the rescue.

The brutalist architecture inside Broadmead Baptist Church, Bristol City Centre.
Broadmead Baptist Church - Heating Replacement

Boiler breakdowns were becoming all too regular at Broadmead Baptist Church. Discover how UES installed a brand new state-of-the-art system.

Gas pipework testing at a First Bus depot carried out by Bristol based engineering company UES
Fitness Worx - Warm Air Heating

Discover how UES helped commercial gym Fitness Worx maintain heat throughout their building with a suspended gas-fired Warm Air Heater.

Mechanical heat ventilation units at GCP Architects fitted by Bristol based HVAC company UES
GCP Architects - Mechanical Ventilation Heat Recovery

Discover how GCP Architects used government funding to bolster their sustainability credentials with two Mechanical Ventilation Heat Recovery units.

A heat emitter in a primary school corridor as part of a new heating system
Lady of the Rosary - Cold Water System & Plant Refit

This job challenged us with a limited timescale through the summer holidays requiring speed, accuracy, and efficiency.

Discover how we replaced the entire cold-water system and refitted the plant room at this primary school in Lawrence Weston.